Photos from the recent erection of flag poles on top of the West Gate Bridge. The poles were erected to hold the Australian and Victorian flags.
CityLink is carrying out strengthening work on the elevated inbound section of the road, to cater for the projected future growth in the number and size of freight vehicles. For further details, read on.
West Gate Freeway roadworks till September 2010
From 8 June to 19 June 2010 a contra flow traffic arrangement will be in place on Hyde Street from 6am - 6pm Monday to friday, and 6am - 4pm Saturdays.
® e-TAG is a registered trade mark of CityLink Melbourne Limited ABN 65 070 810 678.
® Transurban and CityLink are registered trade marks of Transurban Limited ABN 96 098 143 410.
VicRoads Privacy Policy | Transurban Privacy Policy | Disclaimer